WKYT - Home - Headlines

New span put in place on damaged bridged

A contractor crew has put in place a 322-foot-long replacement span on the Eggners Ferry Bridge on Kentucky Lake, closing the gaping hole created when a cargo vessel struck the bridge on the night of Jan. 26.

The span was Tuesday by a crew from Hall Contracting of Kentucky Inc., based in Louisville. The crew is now at work on construction of the bridge deck, which will be of reinforced concrete. The venerable, two-lane bridge carries U.S. 68/KY 80 across the lake between Marshall and Trigg counties. It also serves as the western entrance to Land Between the Lakes National Recreation Area.

The Kentucky Transportation Cabinet awarded Hall Contracting a $7 million, emergency contract to repair and reopen the bridge by Sunday, May 27 – the midpoint of Memorial Day weekend, traditional start of the summer tourism season so vital to the Lakes Region of Western Kentucky.


Comments are posted from viewers like you and do not always reflect the views of this station.
powered by Disqus

Current Conditions

Weather for Lexington, Kentucky
70° F
Mostly Cloudy
Fri
61 47
Sat
67 40
Sun
75 48
Mon
81 58

Opinion

Do you agree with the NTSB’s recommendation to lower the legal blood-alcohol content level to .05 from .08?

Yes
No
Maybe

Most Commented

powered by Disqus

Enter your number for a chance to win great prizes!
Message and data rates may apply
Refuse to Lose

Viewer Photos

Text Links

Premium reloading brass once fired

WKYT

2851 Winchester Rd. Lexington, Ky 40509 859-299-0411 - switchboard 859-299-2727 - newsroom
Gray Television, Inc. - Copyright © 2002-2013 - Designed by Gray Digital Media - Powered by Clickability
User Agent: CCBot/2.0 - 151759105