WKYT | Lexington, Kentucky | News

Hearings Begin On Water Pipeline Proposals

The State Public Service Commission will begin hearings today from both sides about two different water pipeline proposals.

Kentucky American Water wants to build a plant at the Kentucky River at the Franklin-Owen County line with a pipeline stretching to Lexington.

The Louisville Water Company wants to build a pipeline along I-64 to eventually bring water from the Ohio River to Lexington.

The Lexington Herald-Leader reports the commission hearings are expected to last three days with a decision early next year.


Comments are posted from viewers like you and do not always reflect the views of this station.
powered by Disqus

WKYT

2851 Winchester Rd. Lexington, Ky 40509 859-299-0411 - switchboard 859-299-2727 - newsroom
Gray Television, Inc. - Copyright © 2002-2014 - Designed by Gray Digital Media - Powered by Clickability 11813151