WKYT | Lexington, Kentucky | News

Last piece of Ohio River bridge to be blasted

MILTON, Ky. (AP) - Officials say they have rescheduled the demolition of a 600-foot section of an 84-year-old Ohio River bridge connecting Kentucky and Indiana.

The section of the Milton-Madison Bridge is now set for Thursday morning. It had originally been scheduled on Tuesday.

Kentucky officials are asking residents in the Milton area to stay indoors until after the scheduled 9 a.m. blast.

The new span will close at around 9 a.m. and is expected to reopen to traffic by 11 a.m. River traffic will also be closed.

Once the old span is removed, the original piers will be widened to accommodate the new 40-foot-wide bridge. That bridge is currently on temporary piers.

The new bridge will be placed on the renovated original piers later this year.

(Copyright 2013 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.)


Comments are posted from viewers like you and do not always reflect the views of this station.
powered by Disqus

WKYT

2851 Winchester Rd. Lexington, Ky 40509 859-299-0411 - switchboard 859-299-2727 - newsroom
Gray Television, Inc. - Copyright © 2002-2014 - Designed by Gray Digital Media - Powered by Clickability 224045591