Construction project will likely bring delays

MANCHESTER, Ky (WYMT) - Significant traffic impacts are expected to result from a pending road construction project to begin August 7 at the intersection of KY 80 and the Hal Rogers Parkway in Laurel County.

KY 80, U.S. 25 and the Hal Rogers Parkway will be reduced to two lanes of travel in the area adjacent to the intersection from August 7 through October 31.

The project will result in traffic island removal and complete concrete pavement removal and replacement on KY 80 from its intersection with G.O.P Street to its intersection with the Hal Rogers Parkway.

Several different traffic configurations will be required during the course of the project. The public is advised to be aware of lane shifts, changing turning movements and lane relocations at the intersection. Significant delays are expected, and as a result, motorists are advised to take an alternate route if possible.
All work is scheduled on a tentative basis and is subject to change depending on weather conditions, emergencies and other factors beyond the control of the Department of Highways.

The Kentucky Transportation Cabinet asks motorists to be aware of the work zone and to utilize safe driving habits when traveling through the area.

Road condition reports for District 11 routes are available by calling 511 or by visiting the 511 travel and traffic information web site at http://511.ky.gov.


Comments are posted from viewers like you and do not always reflect the views of this station.
powered by Disqus
WYMT CONTACT INFO 199 Black Gold Blvd. Hazard, KY 41701 606-436-5757 - switchboard 606-439-9968 - newsroom
Gray Television, Inc. - Copyright © 2002-2014 - Designed by Gray Digital Media - Powered by Clickability 165191796